Steel Pipe

Our company mainly supply ERW Steel Pipe, Hot Dipped Galvanized Steel Pipe, Square and Rectangular Steel Pipe, Steel Pipe of Lining Plastic, Plastic-coated Steel Pipe, Spiral Steel Pipe, etc; Our steel pipes have acquired certificates of API 5L/5CT, ISO9001, ISO14001, ISO18001, EN10219, FPC and UL / FM quality system.

Steel Pipes are not only used for conveying fluid and powdery solids, exchanging heat energy, making mechanical parts and containers, but also a kind of economic steel. There are many kinds of steel pipes, which can be divided into seamless steel pipe and welded pipe. Steel pipes are widely used.The use of steel pipe to make building structure net frame, pillar and mechanical support can reduce weight, save 20 ~ 40% of metal, and realize mechanized construction of factory. The use of steel pipe to make highway bridges can not only save steel and simplify construction, but also greatly reduce the area of coating protection layer, save investment and maintenance cost. The variety specifications of steel tube products are very various, and their performance requirements are also various. All of these should be distinguished with changes in user requirements or working conditions.

Seamless Steel Pipe

Product Name Carbon steel pipe
Size ERW OD 1/2 Inch -26 inch
SSAW OD 219mm-2540mm
LSAW OD 457.2mm-1422.2mm
Seamless OD 21.3MM-710MM
ERW Thickness 1mm-18mm
SSAW Thickness 5.4mm-25.4mm
LSAW Thickness 7.92mm-50.8mm
Seamless Thickness 3-45mm
Lengths 3-20M
Steel Material GR. B X42 X46 X52 X56 X60 X65 X70 X80, etc
Standard API 5L PLS 1 & PLS 2, A53,A106,A333,A671,A179,A192,A210,EN10217,EN10219,EN10224,JIS G3444 ETC
Usage Oil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission, Boiler Pipe
Surface Bared Black Painting, Anti-Corrosion Coating,Galvanized etc
Proctor Plastic cap
Package Bundles, Bulk,sea worthy wooden case packing or pr your requirement
Inspection With Hydraulic Testing, Ultraic testing or X-ray Test
Certificate API and ISO9001; 2000
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment:  L/C or T/T

    Leava a Message: